ClaimBridge Suite™ Request Beta Access
DRYFLEX™: OverviewTemplates (12)How It WorksPricingDocsBeta Signup →
← Back to DryFlex™ How DryFlex™ Works →
UNIFIED DRYFLEX™ TEMPLATE CATALOG • 12 SCENARIOS

12 Clean-Room DryFlex™ Templates.

Browse 12 clean-room IICRC S500 drying scenarios—review chamber psychrometrics, equipment counts, and F9 justification notes or launch in DryFlex™.

CAT 2 LOSS ~420 SF

Kitchen & Dining Cat 2 Supply Line →

Kitchen & Dining Cat 2 Supply Line

420 SF affected hardwood & toe-kicks at 76°F / 42% RH across 4 drying days.

4 Days • 7 Air Movers • 1 LGR Open →
CAT 3 LOSS ~960 SF

Finished Basement Category 3 Backup →

Finished Basement Category 3 Backup

960 SF affected framing & concrete slab requiring high-grain LGR dehumidification.

5 Days • 12 Air Movers • 2 LGR Open →
MULTI-CHAMBER ~1,400 SF

2-Story Burst Pipe Multi-Chamber →

2-Story Burst Pipe Multi-Chamber

1,400 SF split between Upper Hall and Main Living chambers with independent targets.

5 Days • 16 Air Movers • 2 LGR Open →
CLASS 4 ~680 SF

Vented Crawlspace Class 4 Bound Water →

Vented Crawlspace Class 4 Bound Water

680 SF subfloor & joists tracked against 11% wood moisture dry standard.

6 Days • 6 Air Movers • 1 Desiccant / LGR Open →
CAT 2 LOSS ~210 SF

Master Bath Tile & Vanity Cavity →

Master Bath Tile & Vanity Cavity

210 SF tile substrate, double vanity, and shared bedroom wall cavity (4 days).

4 Days • 5 Air Movers • 1 LGR Open →
COMMERCIAL ~2,400 SF

Commercial Drop-Ceiling Sprinkler Discharge →

Commercial Drop-Ceiling Sprinkler Discharge

2,400 SF open office & drop-ceiling grid with Cat 1/2 stagnation protocol (5 days).

5 Days • 24 Air Movers • 3 LGR Open →
CLASS 4 ~360 SF

Hardwood Floor Mat-Drying Injection →

Hardwood Floor Mat-Drying Injection

360 SF solid oak plank flooring with negative-pressure rescue mat system (6 days).

6 Days • 4 Air Movers • 1 LGR + Mat System Open →
CAT 1 / 2 ~320 SF

Laundry & Water Heater Closet Overflow →

Laundry & Water Heater Closet Overflow

320 SF mechanical closet, hallway, and garage-entry drywall wicking (3 days).

3 Days • 6 Air Movers • 1 LGR Open →
CLASS 2 ~540 SF

Slab-on-Grade Capillary Wick-Up →

Slab-on-Grade Capillary Wick-Up

540 SF perimeter drywall & tack-strip wicking across concrete slab (4 days).

4 Days • 8 Air Movers • 1 LGR Open →
MULTI-UNIT ~1,650 SF

Multi-Unit Vertical Stack Leak (3-Floor) →

Multi-Unit Vertical Stack Leak (3-Floor)

1,650 SF vertical riser leak across 3 stacked condo units with per-unit logs (5 days).

5 Days • 18 Air Movers • 3 LGR Open →
CLASS 3/4 ~1,120 SF

Attic & Roof-Leak Decking Dry-Out →

Attic & Roof-Leak Decking Dry-Out

800 SF roof-sheathing, truss chords, and blown-in insulation bay (4 days).

4 Days • 8 Air Movers • 1 LGR Open →
DESICCANT ~1,100 SF

Cold-Weather Winter Pipe Freeze →

Cold-Weather Winter Pipe Freeze

1,100 SF unheated/low-temp envelope using low-grain desiccant drying (5 days).

5 Days • 12 Air Movers • 1 Desiccant Open →