ClaimBridge Suite™ Request Beta Access
DRYFLEX™: OverviewTemplates (12)How It WorksPricingDocsBeta Signup →
← Back to DryFlex™ Templates (12)
DRY-02 CAT 3 / SEWAGE

Finished Basement Category 3 Backup

Affected Envelope: 960 SF • 7,680 CF 3 Chambers • 5 Days
Engineering Specification

Category 3 sanitary backup across finished basement rec room, hallway, and utility core with 24-inch flood cuts, HEPA air scrubbing, and high-grain LGR sizing.

AFFECTED SF
960 SF
CHAMBER VOL
7,680 CF
TARGET GPP
57 gr/lb
DRYING DAYS
5 Days
Included Zones & Base Parameters
Chamber / ZoneL × WCeilingFloor SFVolume CFEquipment / Target
Basement Rec Room28′×20′8′5604,4807 Air Movers (74°F / 46% RH)
Hallway & Bath Core20′×10′8′2001,6003 Air Movers (74°F / 45% RH)
Utility & Mechanical20′×10′8′2001,6002 Air Movers (74°F / 43% RH)
Total (3 Chambers)——960 SF7,680 CF12 Air • 2 LGR
IICRC S500 Standards Applied
  • ✓IICRC S500 Cat 3 Protocol: Documents regulated waste flood-cut line (24″) and negative-air HEPA scrubber pairing.
  • ✓High-Grain LGR Sizing: 2 LGR units sized for 7,680 CF high-evaporation concrete slab and exposed framing.
  • ✓Carrier Audit Defense: Daily GPP differential table + signed moisture map ready for TPA desk review.
DRYFLEX™ ENGINE

Run S500 Audit & F9 Notes

Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →