ClaimBridge Suite™ Request Beta Access
DRYFLEX™: OverviewTemplates (12)How It WorksPricingDocsBeta Signup →
← Back to DryFlex™ Templates (12)
DRY-09 CAT 1 / CAT 2

Slab-on-Grade Capillary Wick-Up

Affected Envelope: 540 SF • 4,860 CF 2 Chambers • 4 Days
Engineering Specification

Slab-on-grade moisture migration along exterior sill plates and carpet tack strips requiring perimeter tenting and controlled evaporation.

AFFECTED SF
540 SF
CHAMBER VOL
4,860 CF
TARGET GPP
56 gr/lb
DRYING DAYS
4 Days
Included Zones & Base Parameters
Chamber / ZoneL × WCeilingFloor SFVolume CFEquipment / Target
Main Slab Living Zone24′×15′9′3603,2405 Air Movers (76°F / 42% RH)
Perimeter Hall & Bedroom18′×10′9′1801,6203 Air Movers (76°F / 41% RH)
Total (2 Chambers)——540 SF4,860 CF8 Air • 1 LGR
IICRC S500 Standards Applied
  • ✓Concrete Slab Vapor Proof: Tracks relative humidity / Tramex concrete readings alongside drywall sill wicking.
  • ✓IICRC S500 Perimeter Math: Justifies 8 air movers spaced at 12–14 LF along wet perimeter walls.
  • ✓Copy-Ready F9 Notes: Includes tack-strip disposal and antimicrobial slab treatment justification.
DRYFLEX™ ENGINE

Run S500 Audit & F9 Notes

Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →