DRY-06
MULTI-CHAMBER
Commercial Drop-Ceiling Sprinkler Discharge
Affected Envelope: 2,400 SF • 24,000 CF
2 Chambers • 5 Days
Engineering Specification
Fire-sprinkler head discharge across a 2,400 SF commercial office bay requiring ceiling tile removal, plenum drying, and high-capacity LGR/desiccant deployment.
AFFECTED SF
2,400 SF
CHAMBER VOL
24,000 CF
TARGET GPP
52 gr/lb
DRYING DAYS
5 Days
Included Zones & Base Parameters
| Chamber / Zone | L × W | Ceiling | Floor SF | Volume CF | Equipment / Target |
|---|---|---|---|---|---|
| Open Office Workstations | 60′×28′ | 10′ | 1,680 | 16,800 | 18 Air Movers (75°F / 40% RH) |
| Conference & Plenum Bay | 36′×20′ | 10′ | 720 | 7,200 | 6 Air Movers (75°F / 41% RH) |
| Total (2 Chambers) | — | — | 2,400 SF | 24,000 CF | 24 Air • 3 LGR |
IICRC S500 Standards Applied
- ✓Plenum & Grid Volume Math: Includes full 10′ drop-ceiling + plenum air volume (24,000 CF) in dehumidifier sizing.
- ✓Commercial Equipment Ratio: Justifies 24 air movers + 3 commercial LGRs with daily psychrometric logs.
- ✓Downstream Handoff: Pairs with SketchFlex™ COMM-01/COMM-05 layouts and BuildBridge™ commercial work orders.
DRYFLEX™ ENGINE
Run S500 Audit & F9 Notes
Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).