ClaimBridge Suite™ Request Beta Access
DRYFLEX™: OverviewTemplates (12)How It WorksPricingDocsBeta Signup →
← Back to DryFlex™ Templates (12)
DRY-03 MULTI-CHAMBER

2-Story Burst Pipe Multi-Chamber

Affected Envelope: 1,400 SF • 12,600 CF 2 Chambers • 5 Days
Engineering Specification

Multi-level pressurized supply-line burst affecting upper hall/bath and main-level living/ceiling cavity with isolated containment chambers and independent GPP targets.

AFFECTED SF
1,400 SF
CHAMBER VOL
12,600 CF
TARGET GPP
52 gr/lb
DRYING DAYS
5 Days
Included Zones & Base Parameters
Chamber / ZoneL × WCeilingFloor SFVolume CFEquipment / Target
Upper Hall & Bath Chamber25′×20′9′5004,5006 Air Movers (75°F / 41% RH)
Main Living & Ceiling Cavity30′×30′9′9008,10010 Air Movers (75°F / 39% RH)
Total (2 Chambers)——1,400 SF12,600 CF16 Air • 2 LGR
IICRC S500 Standards Applied
  • ✓Multi-Chamber Isolation: Tracks independent intake/exhaust GPP and %MC curves per floor level.
  • ✓Cavity Drying Justification: Includes Injectidry/wall-cavity fan line items and F9 notes for 2-story framing.
  • ✓Downstream Handoff: Imports room volumes directly from SketchFlex™ .CSV and exports to BuildBridge™.
DRYFLEX™ ENGINE

Run S500 Audit & F9 Notes

Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →