ClaimBridge Suite™ Request Beta Access
AUDIT-READY DELIVERABLE ARCHIVES

Inspect Every 5-File Output Bundle Before You Sign Up

Each ClaimBridge Suite™ app exports deterministic PDFs, CSVs, CAD files, and QuickBooks budgets packaged in a single ZIP.

01 • SKETCHFLEX™ CAD BUNDLE

Universal 4-Format Blueprint + Scope Schedule

Generate native Xactimate (.skx), Symbility (.sym), AutoCAD (.dxf), dimensioned cut-sheet (.pdf), and trade-aware _Scope_Schedule.csv with 0.5 ft TrueGeometry™ clamping.

.SKX .SYM .DXF .PDF _Scope_Schedule.csv
Sample _Scope_Schedule.csv Output (COMM-01)
Trade,Item_Code,Description,Qty,Unit
Drywall,DRY-58X,5/8" Type X Drywall (4x8 Sheets),100,EA
Painting,PNT-2C,Interior Paint Two Coats,3200,SF
Trim,FNC-BASE,Baseboard Moulding,200,LF
02 • DRYFLEX™ MITIGATION PACKET

IICRC S500 Justification PDF + Vector Drying Curve

Defend unpaid drying days with automated Magnus-Tetens GPP curves, material %MC vs. Dry Standard tracking, chamber equipment math, and copy-paste Xactimate F9 notes.

S500_Justification_Packet.pdf Drying_Curve.svg Xactimate_F9_Notes.txt
Sample Chamber Drying CurveDay 4: 11.9% MC (Dry)
85.2 GPP Dry Std: 12%
F9 NOTE: Main Level chamber dried from 85.2 GPP to 49.8 GPP; 7 air movers justified per S500.
03 • MOLDFLEX™ S520 CONTAINMENT BUNDLE

S520 Containment Packet + HEPA NAM & 6-Mil Poly Takeoff

Excludes unaffected rooms automatically, calculates 4–8 ACH airflow with 15% HEPA filter-loading derate, and exports 6-mil poly & PPE takeoffs plus F9 notes.

S520_Containment_Packet.pdf Containment_&_PPE_Takeoff.csv Xactimate_F9_Notes.txt
Sample Containment_&_PPE_Takeoff.csv
Zone,Volume_CF,Target_ACH,HEPA_NAMs,Poly_6Mil_SF,Decon
Basement Zone,2400,6,1 (425 CFM net),345,3stage
Living Room,2592,0,Excluded,0,none
04 • BUILDBRIDGE™ PRODUCTION BUNDLE

O&P-Hidden Sub Work Orders + QuickBooks .IIF

Maps 60+ trade codes from Room View to Trade View, strips O&P, tax, depreciation, and target gross margin, and exports field-ready sub PDFs and QuickBooks .iif budgets.

Trade_Subcontractor_Work_Orders.pdf Supplier_Material_Takeoffs.csv QuickBooks_CostCode_Budget.iif
Sample QuickBooks_CostCode_Budget.iif (O&P Stripped)
!BUD	NAME	ACCNT	AMOUNT
BUD	Maple St Rebuild	5100-DRYWALL	4900.00
BUD	Maple St Rebuild	5200-PAINT	2800.00
BUD	Maple St Rebuild	5400-FLOORING	6300.00
05 • TURNBRIDGE™ UNIT TURN BUNDLE

Useful-Life Proration Ledger + Vendor Work Orders

Splits Resident Chargeback from Owner CapEx using standardized asset lifespans (3-yr paint, 5-yr carpet, 7-yr LVP) and exports vendor work orders + QuickBooks .iif.

Trade_Vendor_Work_Orders.pdf QuickBooks_Chargeback_CapEx.csv QuickBooks_CostCode_Budget.iif
Sample Chargeback vs. CapEx Split (2.0 Yr Occupancy)
Trade,Total_RCV,Useful_Life,Resident_Chargeback,Owner_CapEx
Carpet (FCC),$2000.00,5.0 yr,$1200.00 (60%),$800.00 (40%)
Paint (PNT),$900.00,3.0 yr,$300.00 (33%),$600.00 (67%)

Test Your Own Scope Locally or Claim Pilot Access

Run a zero-upload check in your browser with our .ESX Readiness Checker, or bundle all 5 apps for 25% off.