DRY-05
CAT 1 / CAT 2
Master Bath Tile & Vanity Cavity
Affected Envelope: 210 SF • 1,890 CF
2 Chambers • 4 Days
Engineering Specification
Slow shower-pan / angle-stop leak migrating under porcelain tile and into shared primary bedroom drywall cavity requiring targeted cavity injection.
AFFECTED SF
210 SF
CHAMBER VOL
1,890 CF
TARGET GPP
54 gr/lb
DRYING DAYS
4 Days
Included Zones & Base Parameters
| Chamber / Zone | L × W | Ceiling | Floor SF | Volume CF | Equipment / Target |
|---|---|---|---|---|---|
| Master Bath Wet Core | 14′×10′ | 9′ | 140 | 1,260 | 3 Air Movers (76°F / 42% RH) |
| Shared Bedroom Wall Zone | 14′×5′ | 9′ | 70 | 630 | 2 Air Movers (76°F / 40% RH) |
| Total (2 Chambers) | — | — | 210 SF | 1,890 CF | 5 Air • 1 LGR |
IICRC S500 Standards Applied
- ✓Cavity Injection Proof: Documents wall-cavity port drilling and baseboard removal without unnecessary tile demo.
- ✓IICRC S500 Class 2/3 Mix: Separates wet vanity/subfloor core from adjacent bedroom carpet/pad zone.
- ✓Copy-Ready F9 Notes: Pre-built justification for heated air/cavity drying across 4 days.
DRYFLEX™ ENGINE
Run S500 Audit & F9 Notes
Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).