DRY-08
CAT 1 / CAT 2
Laundry & Water Heater Closet Overflow
Affected Envelope: 320 SF • 2,880 CF
2 Chambers • 3 Days
Engineering Specification
Failed 50-gallon water heater pan overflowing into hallway LVP, laundry utility wall, and garage-shared fire-rated drywall.
AFFECTED SF
320 SF
CHAMBER VOL
2,880 CF
TARGET GPP
55 gr/lb
DRYING DAYS
3 Days
Included Zones & Base Parameters
| Chamber / Zone | L × W | Ceiling | Floor SF | Volume CF | Equipment / Target |
|---|---|---|---|---|---|
| Mechanical & Laundry Closet | 10′×8′ | 9′ | 80 | 720 | 2 Air Movers (75°F / 44% RH) |
| Adjacent Hall & Entry | 24′×10′ | 9′ | 240 | 2,160 | 4 Air Movers (75°F / 42% RH) |
| Total (2 Chambers) | — | — | 320 SF | 2,880 CF | 6 Air • 1 LGR |
IICRC S500 Standards Applied
- ✓Rapid 3-Day Dry-Out: Clean Cat 1/2 transition curve showing target GPP achieved within 72 hours.
- ✓Firewall Baseboard Cut: Documents 5/8″ Type-X garage separation drywall inspection and base detach.
- ✓Downstream Handoff: Maps cleanly to TurnBridge™ unit-turn LVP & paint scopes.
DRYFLEX™ ENGINE
Run S500 Audit & F9 Notes
Load this baseline scenario into DryFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • F9 Note
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible