UNIFIED MOLDFLEX™ TEMPLATE CATALOG • 8 SCENARIOS

8 Clean-Room MoldFlex™ Templates.

Browse 8 clean-room IICRC S520 remediation protocols—review containment poly takeoffs, ACH scrubber sizing, and S520 F9 notes or launch in MoldFlex™.

S520 CONTAINMENT ~640 SF

Basement Sill-Plate & Joist Bay Condition 3 →

Basement Sill-Plate & Joist Bay Condition 3

640 SF / 5,120 CF full 6-mil poly containment with 6 ACH negative air (3 days).

3 Days • 6 ACH • 1 HEPA 500 CFM Open →
ATTIC S520 ~900 SF

Attic Sheathing Condensation & Soffit Vent →

Attic Sheathing Condensation & Soffit Vent

900 SF / 5,400 CF attic framing media-blast & HEPA air-wash (4 days).

4 Days • 6 ACH • 2 HEPA 500 CFM Open →
INTERIOR S520 ~120 SF

Bathroom Vanity & Drywall Backing Condition 3 →

Bathroom Vanity & Drywall Backing Condition 3

120 SF / 960 CF wet-wall containment with 8 ACH HEPA scrubber & decon (2 days).

2 Days • 8 ACH • 1 HEPA 500 CFM Open →
COMMERCIAL S520 ~1,800 SF

Commercial Demising Wall Containment →

Commercial Demising Wall Containment

1,800 SF / 18,000 CF occupied-building negative-air barrier (5 days).

5 Days • 6 ACH • 4 HEPA 500 CFM Open →
SUB-GRADE ~760 SF

Crawlspace Vapor-Barrier & Subfloor Media Blast →

Crawlspace Vapor-Barrier & Subfloor Media Blast

760 SF / 3,040 CF sub-grade joist remediation & 12-mil encapsulation prep (4 days).

4 Days • 6 ACH • 1 HEPA 500 CFM Open →
HVAC S520 ~144 SF

HVAC Air-Handler Closet & Return Plenum →

HVAC Air-Handler Closet & Return Plenum

144 SF / 1,296 CF mechanical closet & NADCA/S520 plenum isolation (2 days).

2 Days • 8 ACH • 1 HEPA 500 CFM Open →
INTERIOR S520 ~180 SF

Kitchen Sink Base & Toe-Kick Mold →

Kitchen Sink Base & Toe-Kick Mold

180 SF / 1,620 CF cabinet-bank containment with countertop D&R protection (3 days).

3 Days • 6 ACH • 1 HEPA 500 CFM Open →
MULTIFAMILY ~240 SF

Vacant Turn Unit Hidden Closet Growth →

Vacant Turn Unit Hidden Closet Growth

240 SF / 1,920 CF make-ready closet & exterior-wall thermal-bridge remediation (2 days).

2 Days • 6 ACH • 1 HEPA 500 CFM Open →