MOLD-05
SUB-GRADE / CRAWLSPACE
Crawlspace Vapor-Barrier & Subfloor Media Blast
Affected Envelope: 760 SF • 3,040 CF
1 Chambers • 4 Days
Engineering Specification
High-humidity crawlspace floor-joist and subfloor Condition 3 remediation including debris muck-out, HEPA vacuuming, and vapor-barrier containment.
CONTAINMENT SF
760 SF
AIR VOLUME
3,040 CF
AIR TURNOVER
6 ACH (304 CFM)
6-MIL POLY
1,120 SF
Included Zones & Base Parameters
| Containment Zone | L × W | Ceiling | Floor SF | Volume CF | HEPA / Poly |
|---|---|---|---|---|---|
| Crawlspace Subfloor Bay | 38′×20′ | 4′ | 760 | 3,040 | 1 HEPA (304 CFM) • 1,120 SF Poly |
| Total (1 Zones) | — | — | 760 SF | 3,040 CF | 1 HEPA 500 CFM • 1,120 SF |
IICRC S520 Standards Applied
- ✓Confined-Space S520 Scope: Accounts for 4′ crawl height, Tyvek/respirator PPE, and HEPA exhaust routing.
- ✓Subfloor Moisture Target: Verifies <15% wood moisture before encapsulation or clearance.
- ✓Downstream Handoff: Pairs directly with DryFlex™ DRY-04 crawlspace drying logs.
MOLDFLEX™ ENGINE
Generate S520 Containment Packet
Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).