ClaimBridge Suite™ Request Beta Access
MOLDFLEX™: OverviewTemplates (8)How It WorksPricingDocsBeta Signup →
← Back to MoldFlex™ Templates (8)
MOLD-04 COMMERCIAL

Commercial Demising Wall Containment

Affected Envelope: 1,800 SF • 18,000 CF 2 Chambers • 5 Days
Engineering Specification

Commercial office demising-wall Condition 3 remediation adjacent to occupied tenant suites requiring 2-stage decon, manometer pressure logs, and 6 ACH HEPA filtration.

CONTAINMENT SF
1,800 SF
AIR VOLUME
18,000 CF
AIR TURNOVER
6 ACH (1800 CFM)
6-MIL POLY
2,650 SF
Included Zones & Base Parameters
Containment ZoneL × WCeilingFloor SFVolume CFHEPA / Poly
Main Commercial Containment45′×36′10′1,62016,2003 HEPA (1,620 CFM) • 2,250 SF Poly
2-Stage Decon Airlock18′×10′10′1801,8001 HEPA (180 CFM) • 400 SF Poly
Total (2 Zones)——1,800 SF18,000 CF4 HEPA 500 CFM • 2,650 SF
IICRC S520 Standards Applied
  • ✓Manometer -0.02″ WC Proof: Logs continuous negative differential pressure protecting occupied adjacent suites.
  • ✓4× HEPA Scrubber Sizing: 18,000 CF × 6 ACH ÷ 60 = 1,800 CFM across 4 commercial 500 CFM scrubbers.
  • ✓Carrier & IEP Ready: Formatted for Industrial Hygienist (IEP) clearance sign-off and BuildBridge™ rebuild.
MOLDFLEX™ ENGINE

Generate S520 Containment Packet

Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →