ClaimBridge Suite™ Request Beta Access
MOLDFLEX™: OverviewTemplates (8)How It WorksPricingDocsBeta Signup →
← Back to MoldFlex™ Templates (8)
MOLD-08 CONDITION 3 INTERIOR

Vacant Turn Unit Hidden Closet Growth

Affected Envelope: 240 SF • 1,920 CF 1 Chambers • 2 Days
Engineering Specification

Condition 3 fungal growth discovered during multifamily unit turn behind exterior-wall closet shelving, treated with isolated poly chamber and rapid turn handoff.

CONTAINMENT SF
240 SF
AIR VOLUME
1,920 CF
AIR TURNOVER
6 ACH (192 CFM)
6-MIL POLY
520 SF
Included Zones & Base Parameters
Containment ZoneL × WCeilingFloor SFVolume CFHEPA / Poly
Walk-In Closet & Wall Bay16′×15′8′2401,9201 HEPA (192 CFM) • 520 SF 6-Mil Poly
Total (1 Zones)——240 SF1,920 CF1 HEPA 500 CFM • 520 SF
IICRC S520 Standards Applied
  • ✓Rapid 48-Hour Turn Protocol: Minimizes unit-turn downtime with pre-sized containment and same-day clearance prep.
  • ✓Thermal-Bridge F9 Note: Documents exterior-wall insulation inspection before TurnBridge™ drywall/paint.
  • ✓Downstream Handoff: Routes directly into TurnBridge™ make-ready punchlist and Yardi/AppFolio export.
MOLDFLEX™ ENGINE

Generate S520 Containment Packet

Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →