MOLD-07
CONDITION 3 INTERIOR
Kitchen Sink Base & Toe-Kick Mold
Affected Envelope: 180 SF • 1,620 CF
1 Chambers • 3 Days
Engineering Specification
Slow P-trap leak behind kitchen sink base and dishwasher alcove requiring localized 6-mil containment, cabinet box removal, and wall-cavity HEPA remediation.
CONTAINMENT SF
180 SF
AIR VOLUME
1,620 CF
AIR TURNOVER
6 ACH (162 CFM)
6-MIL POLY
460 SF
Included Zones & Base Parameters
| Containment Zone | L × W | Ceiling | Floor SF | Volume CF | HEPA / Poly |
|---|---|---|---|---|---|
| Kitchen Sink Containment | 15′×12′ | 9′ | 180 | 1,620 | 1 HEPA (162 CFM) • 460 SF 6-Mil Poly |
| Total (1 Zones) | — | — | 180 SF | 1,620 CF | 1 HEPA 500 CFM • 460 SF |
IICRC S520 Standards Applied
- ✓Stone Countertop Protection: Documents temporary shoring/D&R of granite/quartz top during lower cabinet demo.
- ✓IICRC S520 6 ACH Proof: 1,620 CF × 6 ACH ÷ 60 = 162 CFM continuous negative air during demo.
- ✓Downstream Handoff: Exports cabinet & drywall rebuild quantities to BuildBridge™.
MOLDFLEX™ ENGINE
Generate S520 Containment Packet
Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).