MOLD-07 CONDITION 3 INTERIOR

Kitchen Sink Base & Toe-Kick Mold

Affected Envelope: 180 SF • 1,620 CF 1 Chambers • 3 Days
Engineering Specification

Slow P-trap leak behind kitchen sink base and dishwasher alcove requiring localized 6-mil containment, cabinet box removal, and wall-cavity HEPA remediation.

CONTAINMENT SF
180 SF
AIR VOLUME
1,620 CF
AIR TURNOVER
6 ACH (162 CFM)
6-MIL POLY
460 SF
Included Zones & Base Parameters
Containment ZoneL × WCeilingFloor SFVolume CFHEPA / Poly
Kitchen Sink Containment15′×12′9′1801,6201 HEPA (162 CFM) • 460 SF 6-Mil Poly
Total (1 Zones)——180 SF1,620 CF1 HEPA 500 CFM • 460 SF
IICRC S520 Standards Applied
  • ✓Stone Countertop Protection: Documents temporary shoring/D&R of granite/quartz top during lower cabinet demo.
  • ✓IICRC S520 6 ACH Proof: 1,620 CF × 6 ACH ÷ 60 = 162 CFM continuous negative air during demo.
  • ✓Downstream Handoff: Exports cabinet & drywall rebuild quantities to BuildBridge™.
MOLDFLEX™ ENGINE

Generate S520 Containment Packet

Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible