MOLD-03
CONDITION 3 INTERIOR
Bathroom Vanity & Drywall Backing Condition 3
Affected Envelope: 120 SF • 960 CF
1 Chambers • 2 Days
Engineering Specification
Isolated Condition 3 bathroom vanity and shower-surround drywall backing remediation with critical barriers over HVAC registers and 8 ACH negative air.
CONTAINMENT SF
120 SF
AIR VOLUME
960 CF
AIR TURNOVER
8 ACH (128 CFM)
6-MIL POLY
340 SF
Included Zones & Base Parameters
| Containment Zone | L × W | Ceiling | Floor SF | Volume CF | HEPA / Poly |
|---|---|---|---|---|---|
| Isolated Bathroom Chamber | 12′×10′ | 8′ | 120 | 960 | 1 HEPA (128 CFM) • 340 SF 6-Mil Poly |
| Total (1 Zones) | — | — | 120 SF | 960 CF | 1 HEPA 500 CFM • 340 SF |
IICRC S520 Standards Applied
- ✓High-Turnover 8 ACH: 960 CF × 8 ACH ÷ 60 = 128 CFM (1× 500 CFM scrubber throttled/exhausted).
- ✓Critical HVAC Isolation: Documents register masking and vanity/mirror detach-and-reset vs. disposal.
- ✓Copy-Ready S520 F9 Note: Justifies containment setup, PPE, and post-remediation HEPA wipe-down.
MOLDFLEX™ ENGINE
Generate S520 Containment Packet
Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.
Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).