ClaimBridge Suite™ Request Beta Access
MOLDFLEX™: OverviewTemplates (8)How It WorksPricingDocsBeta Signup →
← Back to MoldFlex™ Templates (8)
MOLD-03 CONDITION 3 INTERIOR

Bathroom Vanity & Drywall Backing Condition 3

Affected Envelope: 120 SF • 960 CF 1 Chambers • 2 Days
Engineering Specification

Isolated Condition 3 bathroom vanity and shower-surround drywall backing remediation with critical barriers over HVAC registers and 8 ACH negative air.

CONTAINMENT SF
120 SF
AIR VOLUME
960 CF
AIR TURNOVER
8 ACH (128 CFM)
6-MIL POLY
340 SF
Included Zones & Base Parameters
Containment ZoneL × WCeilingFloor SFVolume CFHEPA / Poly
Isolated Bathroom Chamber12′×10′8′1209601 HEPA (128 CFM) • 340 SF 6-Mil Poly
Total (1 Zones)——120 SF960 CF1 HEPA 500 CFM • 340 SF
IICRC S520 Standards Applied
  • ✓High-Turnover 8 ACH: 960 CF × 8 ACH ÷ 60 = 128 CFM (1× 500 CFM scrubber throttled/exhausted).
  • ✓Critical HVAC Isolation: Documents register masking and vanity/mirror detach-and-reset vs. disposal.
  • ✓Copy-Ready S520 F9 Note: Justifies containment setup, PPE, and post-remediation HEPA wipe-down.
MOLDFLEX™ ENGINE

Generate S520 Containment Packet

Load this baseline scenario into MoldFlex™ or request early access to customize with your job logs.

Output Bundle:.pdf • .csv • S520 F9
Generation Speed:< 30 Seconds
Carrier Audit:100% Defensible
REQUEST EARLY ACCESS →