Turn Approved .ESX Estimates Into O&P-Hidden Sub Work Orders in Seconds.
Stop handing subcontractors your carrier RCV and O&P. BuildBridge™ maps 60+ trade codes from Room View to Trade View, strips O&P/tax/depreciation, and exports field-ready PDFs and QuickBooks .iif budgets.
O&P Stripping & Margin Split Simulator
Where BuildBridge™ Fits in Your Claim Workflow
One Approved Estimate. Every Production File Your Crew Needs.
Upload your approved .esx, .sym, or .csv estimate once. BuildBridge™ strips O&P, tax, and depreciation, regroups items by trade, and outputs O&P-hidden sub work orders, material takeoffs, and QuickBooks .iif budgets.
| Workflow Step | Manual Spreadsheets & Exposed Margins | BuildBridge™ Production Bridge |
|---|---|---|
| Room-to-Trade Grouping | 45–90 min manual line-item sorting | 60+ category codes mapped in 10 sec |
| Subcontractor Work Orders | Carrier RCV & O&P accidentally exposed | O&P, tax & target margin 100% stripped |
| Job-Costing Budgets | Manual QuickBooks re-entry errors | Ready-to-import QuickBooks .IIF & .CSV |
- ✓ Dispatch clean Trade_Subcontractor_Work_Orders.pdf
- ✓ Include trade waste factors on material quantities
- ✓ Eliminate room-by-room hunting for subs
Zero hardcoded carrier guidelines, zero scraped price lists, and zero sharing of your claim files. All calculations use neutral IICRC S500/S520, TrueGeometry™, or your own org rulebooks.
Engineered for Audit Defense & Zero Kickbacks
Room-View to Trade-View
Automatically regroup scattered room line items into clean Drywall, Paint, Flooring, Trim, and MEP subcontractor packets.
Strict O&P & Margin Stripping
Remove O&P, sales tax, and depreciation before issuing field PDFs so subs only see quantities and waste-adjusted material counts.
5-File Production Bundle
Export Trade_Subcontractor_Work_Orders.pdf, Supplier_Material_Takeoffs.csv, and QuickBooks_CostCode_Budget.csv / .iif.
Audit-Ready BuildBridge Archetypes • Scenario Index
Kitchen Water Rebuild (4 Trades)
$24,000 approved RCV split across Drywall, Paint, Cabinets, and Flooring with 30% margin.
Whole-Home Smoke & Fire Rebuild
$85,000 multi-room scope converted into 8 trade packets and QuickBooks .iif.
Master Bath Tile & Vanity Scope
$14,000 bathroom rebuild with tile waste factors and O&P-hidden sub PDF.
Storm Roof & Siding Production
$38,000 exterior restoration split into Roofing, Gutters, and Siding work orders.
Claim the Free O&P-Hidden Work Order Sample Pack
Inspect a complete 5-file BuildBridge™ production bundle (Work Orders PDF + Material Takeoff CSV + QuickBooks .IIF) before signing up.
Quick Answers
Common questions before starting your pilot run.
Never. All O&P, sales tax, depreciation, and target margins are stripped from Trade_Subcontractor_Work_Orders.pdf.
Over 60+ trade category codes map automatically to QuickBooks cost codes with configurable org overrides.
Yes. Every run exports both .IIF (Desktop) and .CSV (Online) budget files.