BLD-03
BATHROOM
Master Bath Tile & Vanity Scope
$14,000 bathroom rebuild with tile waste factors and O&P-hidden sub PDF.
O&P-HIDDEN TRADE WORK ORDER
30% Margin Protected
5100-DRYWALL • Subcontractor PacketO&P: STRIPPED
Hang & Tape 5/8" Type X (incl. 10% waste)352 SF
Texture & Prime Ready for Paint320 SF
Work_Orders.pdf
Material_Takeoff.csv
QuickBooks.iif
Engineering Specification & Standards Applied
- Pre-configured preset parameters: Approved RCV ($) = 14000$, Target Margin (%) = 28%, O&P Embedded (%) = 20%.
- Clean-room IP compliant: zero hardcoded carrier rules or proprietary price lists.
- Deterministic 5-file export bundle generated in under 30 seconds.
LIVE SIMULATOR PRESET
OPEN IN LIVE SIMULATOR →
Request Pilot Access for BLD-03
Run BLD-03 in Live Simulator
Launch the interactive BuildBridge simulator pre-loaded with this scenario's exact field measurements.
Output Bundle:5-File Audit ZIP
Generation Speed:< 30 Seconds
Audit Readiness:100% Defensible