TRN-07
RAPID TURNS
Senior Living / ADA Unit Turn Checklist
Scope Footprint: 660 SF • 5,940 CF
2 Zones • 4 Days
Engineering Specification
Specialized senior-housing and ADA make-ready scope verifying grab-bar anchor integrity, lever-handle hardware, anti-slip shower strips, and wide-door clearances.
UNIT AREA
660 SF
VENDOR SLOTS
3 Vendors
TURN TARGET
4 Days
PMS EXPORT
Yardi / AppFolio
Included Zones & Base Parameters
| Unit Zone / Phase | L × W | Ceiling | Floor SF | Volume CF | Make-Ready Scope |
|---|---|---|---|---|---|
| Living & Bedroom Suite | 26′×20′ | 9′ | 520 | 4,680 | Low-VOC Paint + Lever Trim |
| Zero-Curb Assisted Bath | 14′×10′ | 9′ | 140 | 1,260 | Grab-Bar Torque + Anti-Slip |
| Total (2 Zones) | — | — | 660 SF | 5,940 CF | 3 Vendors • 4-Day Turn |
TurnBridge™ Standards Applied
- ✓Life-Safety & ADA Inspection: Includes 250-lb grab-bar pull test and emergency-call pull-cord verification.
- ✓Low-VOC Zero-Odor Spec: Specifies zero-VOC paint for rapid next-day senior move-in.
- ✓Upstream Handoff: Pairs with SketchFlex™ MF-07 Senior Living Suite.
TURNBRIDGE™ ENGINE
Build Unit-Turn Matrix
Load this baseline workflow into TurnBridge™ or request early access to customize with your estimates.
Output Bundle:.pdf • .csv • Yardi/AppFolio
Generation Speed:< 30 Seconds
Accounting Sync:Clean-Room Ready
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).