ClaimBridge Suite™ Request Beta Access
← All Solutions by Role iGUIDE CAD .PDF • .DXF • Xactimate .XLSX • QuickBooks
MOLD & ENVIRONMENTAL REMEDIATORS • IICRC S520 CONTAINMENT & RECON

Size S520 Containment, 4/6 ACH HEPA Scrubbers & Put-Back Scopes From One Sketch.

Stop hand-calculating cubic-foot ACH derates and re-typing containment tear-outs for reconstruction. Bridge field dimensions straight to S520 packets and sub work orders.

END-TO-END CLAIM WALKTHROUGH

Sample Claim Flow: 3756 Marantz Pl, Hamilton, ON (Basement Remediation)

SketchFlex™ Step 1 • Multi-Level Room & Height Capture

Import iGUIDE 2D CAD .PDF to extract 14 rooms and 13 exact ceiling heights (e.g., C=7′10″ basement vs. C=8′11″ main).

Explore SketchFlex™ →
MoldFlex™ Step 2 • S520 Zone & HEPA Sizing

MoldFlex™ applies a 15% filter-loading derate, pairs 1:1 FHEPA/NAFAN> at 4 or 6 ACH, adds EQP MANO, 6-mil poly SF, and HMR PRV clearance.

Explore MoldFlex™ →
BuildBridge™ Step 3 • Post-Remediation Put-Back

Hand off drywall, prime/seal, and flooring replacement directly to BuildBridge™ for O&P-hidden trade sub work orders.

Explore BuildBridge™ →
Before ClaimBridge™

Manual volume spreadsheets, mismatched HEPA CFM counts, and re-entering tear-out rooms for rebuild bids.

With ClaimBridge™ Handoff Layer

Deterministic S520 zone math plus 1-click handoff into post-remediation reconstruction.

Recommended Entry Path

Start with MoldFlex™ ($149/mo) and add BuildBridge™ or SketchFlex™ for 15%–20% bundle savings.