BLD-07
MULTI-TRADE
Fire & Smoke Structural Framing & Seal-Paint
Scope Footprint: 1,200 SF • 10,800 CF
2 Zones • 16 Days
Engineering Specification
Post-fire structural and odor-sealing rebuild packet sequencing char-framing replacement, pigmented shellac encapsulation, insulation, and full interior finishes.
SCOPE AREA
1,200 SF
TRADE PACKETS
5 Trades
DURATION
16 Days
O&P PRIVACY
100% Hidden
Included Zones & Base Parameters
| Trade / Scope Package | Span / Qty | Height | Floor SF | Volume CF | Deliverable Spec |
|---|---|---|---|---|---|
| Affected Framing & Attic | 30′×20′ | 9′ | 600 | 5,400 | Rafter Sistering + Shellac Seal |
| Adjacent Smoke-Affected Rooms | 30′×20′ | 9′ | 600 | 5,400 | 2-Coat Primer + Finish Paint |
| Total (2 Zones) | — | — | 1,200 SF | 10,800 CF | 5 Trade POs • QuickBooks .IIF |
BuildBridge™ Standards Applied
- ✓Odor-Clearance Hold Gate: Separates shellac encapsulation sign-off before insulation and drywall hang.
- ✓O&P-Hidden Trade POs: Protects GC overhead while giving framers and painters exact SF/LF counts.
- ✓QuickBooks .IIF Ready: Syncs job-costed vendor bills cleanly into QuickBooks.
BUILDBRIDGE™ ENGINE
Generate Trade POs & .IIF
Load this baseline workflow into BuildBridge™ or request early access to customize with your estimates.
Output Bundle:.pdf • .csv • .iif
Generation Speed:< 30 Seconds
Accounting Sync:Clean-Room Ready
FREE SAMPLE PACKET
Get Clean-Room Sample Packet
Enter your work email and we will send this sample packet directly to your inbox (1 template per request).