ClaimBridge Suite™ Request Beta Access
BUILDBRIDGE™: OverviewTemplates (8)How It WorksPricingDocsBeta Signup →
← Back to BuildBridge™ Templates (8)
BLD-07 MULTI-TRADE

Fire & Smoke Structural Framing & Seal-Paint

Scope Footprint: 1,200 SF • 10,800 CF 2 Zones • 16 Days
Engineering Specification

Post-fire structural and odor-sealing rebuild packet sequencing char-framing replacement, pigmented shellac encapsulation, insulation, and full interior finishes.

SCOPE AREA
1,200 SF
TRADE PACKETS
5 Trades
DURATION
16 Days
O&P PRIVACY
100% Hidden
Included Zones & Base Parameters
Trade / Scope PackageSpan / QtyHeightFloor SFVolume CFDeliverable Spec
Affected Framing & Attic30′×20′9′6005,400Rafter Sistering + Shellac Seal
Adjacent Smoke-Affected Rooms30′×20′9′6005,4002-Coat Primer + Finish Paint
Total (2 Zones)——1,200 SF10,800 CF5 Trade POs • QuickBooks .IIF
BuildBridge™ Standards Applied
  • ✓Odor-Clearance Hold Gate: Separates shellac encapsulation sign-off before insulation and drywall hang.
  • ✓O&P-Hidden Trade POs: Protects GC overhead while giving framers and painters exact SF/LF counts.
  • ✓QuickBooks .IIF Ready: Syncs job-costed vendor bills cleanly into QuickBooks.
BUILDBRIDGE™ ENGINE

Generate Trade POs & .IIF

Load this baseline workflow into BuildBridge™ or request early access to customize with your estimates.

Output Bundle:.pdf • .csv • .iif
Generation Speed:< 30 Seconds
Accounting Sync:Clean-Room Ready
REQUEST EARLY ACCESS →