ClaimBridge Suite™ Request Beta Access
BUILDBRIDGE™: OverviewTemplates (8)How It WorksPricingDocsBeta Signup →
← Back to BuildBridge™ Templates (8)
BLD-03 MULTI-TRADE

2-Story Burst Pipe Multi-Trade Packet

Scope Footprint: 1,400 SF • 12,600 CF 2 Zones • 14 Days
Engineering Specification

Coordinated two-story reconstruction schedule sequencing rough plumbing, upper tile/vanity, main-level ceiling drywall, hardwood refinish, and whole-room paint.

SCOPE AREA
1,400 SF
TRADE PACKETS
6 Trades
DURATION
14 Days
O&P PRIVACY
100% Hidden
Included Zones & Base Parameters
Trade / Scope PackageSpan / QtyHeightFloor SFVolume CFDeliverable Spec
Upper Bath & Hall Recon25′×20′9′5004,500Tile, Vanity, 2-Coat Paint
Main Living Ceiling & Floor30′×30′9′9008,1005/8″ Ceiling + Oak Refinish
Total (2 Zones)——1,400 SF12,600 CF6 Trade POs • QuickBooks .IIF
BuildBridge™ Standards Applied
  • ✓Critical-Path Trade Sequencing: Orders MEP rough-in, drywall, hardwood sand/finish, and final paint without overlap.
  • ✓O&P-Hidden Sub Packets: Keeps GC margin private while giving each sub exact room-by-room quantities.
  • ✓QuickBooks .IIF Ready: Exports 6 vendor purchase orders in one batch.
BUILDBRIDGE™ ENGINE

Generate Trade POs & .IIF

Load this baseline workflow into BuildBridge™ or request early access to customize with your estimates.

Output Bundle:.pdf • .csv • .iif
Generation Speed:< 30 Seconds
Accounting Sync:Clean-Room Ready
REQUEST EARLY ACCESS →